Or do you allow them to pay everything when the job is done?
Second time client signed our contract many days ago, but still has not sent my usual 50% deposit. Is it because it slipped his mind, or is it likely that he thinks a deposit shouldn't be required for a second-time client that I trust to pay me? I don't want to offend him, but I always prefer to wait to start working until I have my deposit.
Great design resource
100 Things Every Designer Needs to Know About People (Voices That Matter) Submitted August 31, 2018 at 02:35PM by WritingTherapy https://ift.tt/2NDIz6a
No comments:
Post a Comment